Guru Gobind Singh Indraprastha University,
East Delhi Campus
(School Of Architecture & Planning, School Of Design)
Project Size 75,900 Sqm.
Completion 2022
Client Guru Gobind Singh Indraprastha
University, Delhi.
Project cost Rs. 415 Cr.(Approx)
BIO-CLIMATIC PASSIVE ARCHITECTURE
INTEGRATED DESIGN PROCESS…
- Building a green building is not just a matter of assembling a collection of the latest green technologies or materials. Rather, it is a process in which every element of the design is first optimized and then the impact and interrelationship of various different elements and systems within the building and site are re-evaluated, integrated, and optimized as part of a whole building solution.
(NZDB) – NET ZERO DISCHARGE BUILDING:-
- Building will have to produce surplus energy over the year, will be called energy plus building.
- Zero discharge buildings will reduce significant energy use and green house emission for life of building.
- NZDB vision in building industry is becoming necessary as they take away 70% of electricity.
- European Union has issued a NZDB mandate, which says all residential + commercial buildings should be net zero by 2019.
- State of California has a similar mandate of 2020 for residential and 2030 for commercial buildings.